New litter interceptors installed in Soet River to control water pollution
City of Cape Town has invested an additional R1.1 million in the installation of three litter interceptors designed to trap floating waste such as plastic, cans, bottles and domestic refuse…
Cape Town aims to secure balance between Water Resources and its Demand
The revised strategy outlines the planned interventions of the City of Cape Town for the next decade to ensure sustainable water use that improves water distribution system performance and reduce…
Cape Town cleans Newlands Reservoir as part of annual proactive water maintenance programme
City of Cape Town is carrying out its annual cleaning and maintenance operation at the Newlands Reservoir to ensure the long-term safety and functionality of the critical water infrastructure. This…
City of Cape Town begins Zandvliet Treated Effluent Re-use Pump Station construction
The City of Cape Town aims to strengthen water resilience and diversify its supply sources by increasing access to this resource.
City successfully replaces water pipes across Cape Town
The City of Cape Town has accelerated its pipe replacement efforts for the 2024-25 financial year by investing just over R523 million to replace the aged water and sanitation infrastructure.
Cape Town commemorates 5th annual Water Star Rating Awards
This initiative forms part of the broader Water Strategy goals of the City of Cape Town to encourage responsible water use, that supports cleaner inland waterways and transition Cape Town…
Cape Town urges residents to submit comments for FNWS as project aims to drinking water
The City of Cape Town is conducting a feasibility study in terms of the Section-78 process of the Local Government: Municipal Systems Act, Act 32 of 2000 and requires input…
Cape Town establishes Eerste or Kuils River Catchment Management Forum
The main purpose of the EKR CMF is to promote the community-driven initiatives that aims at improving the condition of polluted rivers and their surrounding environment. Multiple stakeholders residing or…
Bellville’s Fynbos Dam upgradation work to resume soon
The construction work will also include a new stepped spillway discharge channel and lining the channel with reno-mattresses and gabions. Gabions can be used to protect the basin from erosion.