New Stormwater Infrastructure work begins in Khayelitsha
The project will assist in ensuring safer road driving conditions and reducing the risk of the roads deteriorating as a result of continuous flooding and standing water.
Cape Town begins with rehabilitation work of Blinkwater Stream in Camps Bay
The upgradation mainly aims to ensure the Blinkwater Stream that can accommodate the intended flow rates, thereby enhancing the sustainability of the system for the coming years.